Engine 31 arrives to a fully involved vacant 1.5 story dwelling.
Heavy fire load deems a Defensive start for original fire bldg.
Fire spreads to Exposures #2, #3 & #4 sides
Downed power lines slows up operations
3 -2½” & 4 -1¾” Lines in use
L-14 airborne & flowing for overhaul
ON Scene:
Engines: 31, 22, 28, 23, 3, 21, 35
Ladders: 14, 6 , 7, 5, 10, 15 FAST, Rescue1
Chiefs: B-43, B-46, B-41, B-52, B-56
Support Staff: F-20, 8, 11, 72, 39, 76
10-18-2013 – Time Out: 02:14 hrs
Damages: $90K